VA Lenders Handbook (VA Pamphlet 26-7), Chapter 13, Topic 11 — New Construction
VA Lenders Handbook (VA Pamphlet 26-7), Chapter 13, Topic 11 — New Construction.
Verbatim regulatory text
Verbatim provisions from VA Lenders Handbook (VA Pamphlet 26-7), Chapter 13, Topic 11 — New Construction — each quote is a verified substring of the regulator-published source snapshot, not retyped. Quoted for reference; this is not legal advice. The operational layer (P&P updates, prompts) lives in the regulation update kits.
VA Lenders Handbook (VA Pamphlet 26-7), Chapter 13, Topic 11 — New Construction
11. New Construction Inspections/Warranty For new construction properties, either 11a or 11b must be required based on whether or not local building inspections are performed. Since new construction must have either a 1 year or a 10-year warranty, either 11c or 11d must be marked.